Answer
$\$ 53, 075$
Work Step by Step
We calculate the maximum acceptable bid by increasing the Architect's estimate by the percentage given in "maximum rate above estimate":
$$
10\% \times48,250+48,250=0.1\times48,250+48,250=4,825+48,250=\$ 53, 075
.$$